• Installation of hydraulic services including hot water, cold water, condensate drainage, sanitary plumbing and trade waste
  • Installation of stormwater retention system beneath car parks and roads
  • Installation of internal sewer at depth of approximately 7m in challenging ground conditions
  • Completed 2014

Working closely with BGC Construction the main challenges were the ground conditions due to the perched water table.


Gallery